Abstract

This paper presents a description of the CO2 removal process of 500MW coal and gas fired power plants. The parameters and other operating conditions for Aspen Plus rate based model were selected to achieve 85% of CO2 removal. The effects of absorber pressure and packing height on re-boiler duty are studied. Re-boiler duty is decreasing with the increase of packing height and absorber pressure. The effect of solvent properties on CO2 removal efficiency is also analyzed. The removal efficiency increases as the increase of MEA concentration and temperature. When the lean loading of MEA solvent is increased, efficiency of the removal process is decreasing. The liquid and vapour phase temperature profiles and CO2 loading in the absorber are analyzed to understand the model behaviour.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.