Abstract
The American Society of Mechanical Engineers has published a new standard for the design of below-the-hook lifting devices. This standard defines design requirements for lifting devices used in conjunction with cranes, derricks, and other types of hoisting equipment. Chapter 3 of the standard addresses the structural design requirements for lifting devices. Although most of the design provisions are based on familiar principles and practices, the provisions for the design of pinned connections are significantly different from more common specification requirements. The discussion and analyses presented in this paper demonstrate that these provisions for the design of pin-connected plates provide reliability equal to or greater than that upon which the design factors in the standard are based, thus demonstrating that these provisions are acceptable for the intended purpose of the design of below-the-hook lifting devices. Also discussed is how to address a pinned connection with a large pin-to-hole clearance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Practice Periodical on Structural Design and Construction
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.