Abstract

Through multiple simulations and statistics of its capacity deficit data, the basic value of the energy storage capacity that can cover most wind conditions is determined. Considering that during the black start process, other aspects other than the plant electricity also occupy the energy storage capacity, and the capacity compensation is made in the calculation. Finally, the verification model shows that its energy storage capacity configuration can support the black start task of the auxiliary plant in the area under most wind conditions and has certain economic efficiency.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.