Abstract
The super-conducting Relativistic Heavy Ion Collider (RHIC) with two separate rings and six combined interaction regions will provide collisions between equal and unequal heavy ion species up to Au ions in typically 60 bunches. The betatron tunes of the two beams are among the most important parameters to be measured. The tunes have to be acquired at any moment during accelerator operation and in particular during the acceleration process. At RHIC the tune measurement device (ARTUS) consists of a fast horizontal and vertical kicker magnet and a dedicated beam position monitor in each ring. The system layout is described and first experiences from operation is reported.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.