Abstract

As the conventional prediction methods for production of waterflooding reservoirs have some drawbacks, a production forecasting model based on artificial neural network was proposed, the simulation process by this method was presented, and some examples were illustrated. A workflow that involves a physics-based extraction of features was proposed for fluid production forecasting to improve the prediction effect. The Bayesian regularization algorithm was selected as the training algorithm of the model. This algorithm, although taking longer time, can better generalize oil, gas and water production data sets. The model was evaluated by calculating mean square error and determination coefficient, drawing error distribution histogram and the cross-plot between simulation data and verification data etc. The model structure was trained, validated and tested with 90% of the historical data, and blindly evaluated using the remaining. The predictive model consumes minimal information and computational cost and is capable of predicting fluid production rate with a coefficient of determination of more than 0.9, which has the simulation results consistent with the practical data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.