Abstract

In this paper, we consider a sequence-dependent disassembly line balancing problem (SDDLBP) with multiple objectives that requires the assignment of disassembly tasks to a set of ordered disassembly workstations while satisfying the disassembly precedence constraints and optimizing the effectiveness of several measures. Since the complexity of SDDLBP increases with the number of parts of the product, an efficient methodology based on artificial bee colony (ABC) is proposed to solve the SDDLBP. ABC is an optimization technique which is inspired by the behavior of honey bees. The performance of the proposed algorithm was tested against six other algorithms. The results show that the proposed ABC algorithm performs well and is superior to the other six algorithms in terms of the objective values performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.