Abstract

The ARIES (Advanced Recovery and Integrated Extraction System) Project is an integrated system at the Los Alamos Plutonium Facility for the dismantlement of nuclear weapons. The plutonium produced by the ARIES process was measured by an integrated nondestructive assay (NDA) system. The performance of the NDA systems was monitored by a measurement control program which is a part of a nuclear material control and accountability system. In this paper we will report the results of the measurements of the measurement control standards as well as an overview of the measurement of the ARIES process materials.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.