Abstract

In this issue of Joule, Steffen et al. tackle a challenging topic to quantify and project costs for operation and maintenance (O&M) of solar and wind power plants in Germany. They note that O&M costs can be 20%–25% of overall costs and find that such costs have decreased, resulting in common overestimates of O&M costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.