Abstract

This paper deals with a production control problem for the testing and rework cell in a dynamic and stochastic computer integrated manufacturing (CIM) system. A dynamic controller is designed to handle three different production control decisions; dispatching, pre-emption, and dispatching within pre-emption. The model of this system also helps users deal with a large number of input features in real situations. This paper describes a technical architecture of dynamic production control and design issues of a dynamic production controller. It explains the overall development processes of the system and functional diagrams in order to give readers a design guideline for the dynamic production controller.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.