Abstract

A new inspection standard that enhanced quality of operating /maintenance management of the nuclear power plant was introduced in 2009. After the Fukushima Daiichi nuclear disaster (Mar. 11th 2011), the situation surrounding the nuclear industry has dramatically changed, and the requirement for maintenance management of nuclear power plants is pushed for more stringent nuclear safety regulations. The new inspection standard requires enhancing equipment maintenance. It is necessary to enhance maintenance of not only equipment but also piping and pipe support. In this paper, we built the methodology for enhancing maintenance plan by rationalizing and visualizing of piping and pipe support based on the “Maintenance Program” in cooperating with 3D-CAD system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call