Abstract

This paper discusses the Khudoni hydroelectric station. The selection of the type and site of the dam are described. A plan of the hydro development with the chosen concrete arch dam is shown. Engineering-geologic and seismotectonic conditions of the chosen site are examined. Two types of design were examined for the arch dam, and they are described. Structural elements of the dam are discussed as is reinforcement, stress-strain state, underground contour and outlet works.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.