Abstract
The clay mining activities carried out by PT X have resulted in an excavation pit, if there is no post-mining management that is carried out, it will decrease the productive land of the community along with native flora and fauna. This research aims to provide recommendations for post-mining reclamation direction of clay. The method used is survey and mapping method refers to Matric 17 of the Decree of The Minister of Energy and Mineral Resources of The Republic of Indonesia Number 1827 K/30/MEM/2018 about Reclamation Assessment Guidelines for Production Operation and the things to be analyzed are the stages of reclamation activities that have been carried out and purposive sampling method for soil sampling which will later be tested in the laboratory and then the results obtained will be matched with criteria for soil analysis results. Based on the results the land stewardship that carried out was leveling, stocking top soil, making drainage, and channel repairment. The revegetation carried out was planting of klampis, vetiver, and trembesi around the mine road. The final completion carried out is treatment up to two years of age, fertilization, and checking of reclaimed plants. The recommended clay post-mining land reclamation direction is revegetation with vetiver plants (cover crops) with spacing of (1x1) meter, eucalyptus (fast-growing plant) with spacing of (3x1) meter, and peanut (local plants) with spacing of (30x30) cm, then will be planted with a pot system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.