Abstract

ABSTRACTThe streambed‐leakage factor ranged from 0.11 to 1.68 million gallons per day per acre per foot of head loss. Most values for the streambed infiltration rate and the streambed‐leakage factor for six tests before 1970 were higher than for six tests in 1976–79, suggesting a change in streambed permeability in the intervening time.A well field to serve a government‐owned uranium enrichment facility, consisting initially of 4 wells, later increased to 15 wells, was designed to yield up to 20 million gallons per day. The wells are on a line parallel to the river at distances from the stream ranging from 122 to 330 feet. Distance between wells ranges from 190 to 303 feet. Specific capacities of the wells, based on 24‐hour acceptance tests, ranged from 63 to 147 gallons per minute per foot of drawdown and averaged 100 gallons per minute per foot of drawdown. By late Summer of 1976, pumpage from all 15 wells ranged from 12 to 15 million gallons per day. Drawdown was about as expected, based on design criteria developed from the aquifer tests, except that pumping levels were lower than expected in the Fall and Winter of 1976–77, resulting from low streamflow and low river temperature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call