Abstract

The Australian Bureau of Meteorology’s ‘Australian Parallel Suite’ (APS) operational numerical weather prediction regional Australian Community Climate and Earth-System Simulator (ACCESS) city-based system (APS1 ACCESS-C1) was updated in August 2017 with the commissioning of the APS2 ACCESS-C2. ACCESS-C2 runs over six regional domains. Significant upgrade changes included implementation of Unified Model 8.2 code; nesting in the 12 km resolution APS2 ACCESS-R2 regional model; and, importantly, an increased horizontal resolution from 4 to 1.5 km, enabling C2 to become the first Australian operational convection-permitting model (CPM). Traditional rainfall verification metrics and Fractions Skill Score show C2 forecast skill over ACCESS-C domains in summer and winter was generally, and in many cases, significantly better than C1. Case studies showed that C2 forecasts had better-detailed wind and precipitation fields, particularly at longer forecast ranges and higher rain rates. The improvements in C2 forecasts were principally due to its CPM ability to simulate high temporal and spatial resolution features, which continue to be of great interest to forecasters. C2 also laid the groundwork for the present day APS3 ACCESS-C forecast C3 and ensemble CE3 models and further development of higher resolution (down to 300 m) fire weather and urban models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.