Abstract
This work presents approximation algorithms for scheduling the tasks of a parallel application that are subject to precedence constraints. The considered tasks are malleable which means that they may be executed on a varying number of processors in parallel. The considered objective criterion is the makespan, i.e., the largest task completion time.We demonstrate a close relationship between this scheduling problem and one of its subproblems, the allotment problem. By exploiting this relationship, we design a polynomial time approximation algorithm with performance guarantee arbitrarily close to \( {{\left( {3 + \sqrt 5 } \right)} \mathord{\left/ {\vphantom {{\left( {3 + \sqrt 5 } \right)} {2 \approx 2.61803}}} \right. \kern-\nulldelimiterspace} {2 \approx 2.61803}} \) for the special case of series parallel precedence constraints and for the special case of precedence constraints of bounded width. These special cases cover the important situation of tree structured precedence constraints. For the general case with arbitrary precedence constraints, we give a polynomial time approximation algorithm with performance guarantee \( 3 + \sqrt 5 \approx 5.23606 \).KeywordsApproximation AlgorithmTime SlotAllotment ProblemCritical PathPrecedence ConstraintThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.