Abstract

This paper deals with a parallel machine scheduling problem. Different from fixed processing time assumption in the classical scheduling, a job’s processing time is a simple linear increasing function of its starting time. The aim is makespan minimization, and our focus is on the case with an arbitrary number of parallel machines. We prove that LIST rule is (1+bmax)m−1m-approximation where m is the number of machines and bmax is the maximum deteriorating rate of job. We then propose one heuristic LDR (Largest deteriorating Rate first). The heuristic is proved by (1+bmin)m−1m-approximation where bmin is the minimum deteriorating rate. We further show that this ratio is tight when m=2,3 and 4.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.