Abstract

We consider a problem of scheduling rigid parallel jobs on variable speed processors so as to minimize the total energy consumption. Each job is specified by its processing volume and the required number of processors. We propose new constant factor approximation algorithms for the non-migratory cases when all jobs have a common release time and/or a common deadline.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.