Abstract
In this paper, we consider scheduling problems with slack (different) due-window assignment and time-dependent processing times. The processing time functions are all a proportional linear increasing function of time. On a single-machine setting, the goal is to minimize a cost function that includes earliness, tardiness, due-window starting time and size, and the number of early and tardy jobs. Some relevant optimality properties and polynomial time solution algorithms are proposed to solve these two problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.