Abstract

ABSTRACTA customer-oriented dynamic cyclical adjustment approach is applied to optimize a high-speed railway train stop plan, which includes five steps that should be repeated until reasonable passenger transfer efficiency is reached. First, an improved Frank-Wolfe algorithm is used to assign passenger flow. Second, the obtained train stop plan is evaluated. Finally, the evaluation result is used as a feedback to adjust the train stop plan, a new line plan scheme with new train stop plan is obtained, and another passenger flow distribution is applied. A numerical experiment is carried out by taking the Beijing-Shanghai high-speed railway network in China as a background.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.