Abstract

This study was applied in a welding wire manufacturing plant to improve the quality of the manufactured welding wires, reducethe manufacturing waste and increase the yield of the manufacturing process, by applying the Lean Six Sigma (LSS) methodology and waste management. LLS is considered one of the successful approaches in the field of quality improvement and cost reduction. The case study plant working environment was analyzed to isolate the root causes for the waste generation. Remedies and countermeasures were suggested and some were implemented. The study compares the performance of the plant before and after implementation of the proposed solutions for waste reduction. Improvements in yield, waste, Defects Per Million Opportunities (DPMO), and sigma levels were achieved.The LSS methodology was linked to the Analytic Hierarchy Process (AHP) to prioritize the causes of waste. The objective was to use an analytical method in judging the influence of the waste causes on the amount of waste to enrich the methodology effectiveness and facilitate some ease of use in the practical field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.