Abstract

Crew scheduling is one of the crucial processes in railroad operation planning. Based on current regulations and working and break time requirements, as well as the operational rules, this process aims to find a duty arrangement with minimal cost that covers all trips. Most past studies considered this subject for railroad systems as an optimization problem and solved it with mathematical programming-based methods or heuristic algorithms, despite numerous logical constraints embedded in this problem. Few studies have applied constraint programming (CP) approaches to tackle the railroad crew scheduling problem. This paper proposes a hybrid approach to solve the problem with a CP model for duty generation, and an integer programming model for duty optimization. These models have been applied to the Kaohsiung depot of Taiwan Railways Administration, the largest railroad operator in Taiwan. The encouraging results show that the proposed approach is more efficient than the manual process and can achieve 30% savings of driver cost. Moreover, the approach is robust and provides flexibility to easily accommodate related operational concerns such as minimizing the number of overnight duties. Thus, this hybrid two-phase approach seems to have the potential for applications to the railroad crew scheduling problems outside Taiwan.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.