Abstract

Recently, many problems regarding differential settlement for newly constructed buildings in Fayoum city, Egypt have been monitored. This research presents an applied technique for utilizing total station in observing horizontal and vertical movements happening by time for some building in Fayoum city. The building was monitored for thirty three months divided into three phases. In the first phase, façade of building was observed for four and half months to monitor differential settlement and take the right decision for resolving differential settlement problem. The second phase was the execution of that decision. Time for second phase was four and half months. Finally, in the third phase façade of building was reobserved for two years in order to make sure that the movement of façade points was stopped. The obtained results showed that the used technique provided a powerful and efficient tool to observe movements of façade points by time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.