<p>Because of the limitations of Earned Value Management (EVM), there are great defects in managing software progress. Although Earned Schedule (ES) improves EVM, it is not reliable to utilize cost data to measure software progress. In 2014, Earned Duration Management (EDM), which is a new measurement method, was introduced. In this paper, via a practical case, the EDM method is used to measure the software progress.</p>