Abstract
During the operation of producing oil and gas wells, oil from formations is extracted together with water. In the case of a significant water cut in a well it is economically feasible and technologically necessary to carry out geological and technical actions (GTA) with the aim to reduce the water cut - repair and isolation works (RIW). Designing actions for RIW is associated with a analysis of the reasons of increase of water cut and the development of methods for eliminating the identified problem. The use of expert systems makes it possible to implement an integrated approach to the design of actions for RIW with a choice of necessary compositions, and designs of works, taking into different processes. Keywords: expert system; repair and insulation works; optimization; design.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.