Abstract

Any mine planning requires careful prediction of both the head grade andtonnage ofmineralization. There are various methods of interpolation that attempt to provide reasonable estimatesat unsampled locations. All of these give realizations that are unduly smooth and extremevalues that occur in reality are not reflected in these estimates. Such methods, therefore,provide limited scope for accurate risk assessment. An alternative approach that is rapidlygaining popularity is the method of conditional simulation. This approach attempts to reproduceboth the grade distributions of the sample data as well as its spatial variability. In this paper,a case study is presented on a platinum mineralization to demonstrate and compare sequentialGaussian and sequential conditional simulation techniques and to quantify and discuss therelevant sensitivities.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.