Abstract

Abstract Lost circulation is a complicated situation in the drilling operation, wasting a lot of time and mud during processing. A serious lost circulation can cause hazards, such as sticking, blowout and collapse of well. There are some problems in conventional plugging technology, such as particle size of plugging material does not match crack width, slip of the blocking zone, and weak adhesion of lost circulation additive to the rock, which restricts the success rate of lost circulation operation. Regular and elastic polyhedron structure material compounds elastic variable network plugging material and rigid plugging materials to form a loss circulation materials (LCM)plugging mixture for different leakage speed and crack width affected by stress. Through plugging and HTHP sand bed experiment loss circulation materials(LCM) and amount of gel were optimized and improved. Through indoor simulation about leakage process of different leakage speed and different crack sizes, the on-site construction formula suitable for wells under different temperature is formed and determined. Scanning electron microscope shows the plugging gel has a variable network structure. By changing the ratio of elastic plugging material, rigid plugging material and gel, a LCM plugging formula for high temperature and high pressure formations can be formed to meet the pressure requirement of 7.5MPa. Leakage simulation formed on-site plan under different leakage rate to adapt to 180°C. The novel CPM material has been well-field tested and used for HPHT reservoirs. When the rate of leakage less than 30 m3/h and 30-60 m3/h, success rate of single plugging is more than 95% and rate of leakage greater than 60 m3/h success rate of single plugging beyond 80%. Leakage loss time is more than 80% shorter than conventional plugging techniques.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call