Abstract

Researches in reservoir operation rules had already been studied more than half a century but much still remains to be done. Besides, as a result of global climate change and many nature or human causes, make the frequency and intensity of a lot of hydrological events such as drought and flood change, the existing reservoir operation rules need to change. This paper aims at reservoir operation rule -curves in detail, and applies to the newly rising evolution alg orithms to optimize reservoir operation systematically. Furthermore, the study detects the drought events by the prediction data and water resource system model, optimizes the double -group rule-curves and makes the water resources more effectively. The LiYuTan reservoir in Taiwan, for example, establish, the up -to-date operation rule.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.