Abstract

As a lightweight, fast, airtight, flexible foundation pit supporting structure, lasson steel sheet pile has obvious advantages of short-cycle and low-cost during the construction of double track railway abutment. However, the influence of insertion and extraction of steel sheet pile to original lines is also very big. Therefore, timely backfill grouting, settlement displacement observation and propermaintenance are needed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.