Abstract
Taking Shangqiu Yide 220kV outdoor HGIS substation as an example, this paper proposes a optimization design layout set of 220kV HGIS and 110kV HGIS power distribution devices through the application of three-dimensional safety clearance verification, HGIS equipment transportation, installation and hoisting, maintenance, inspection simulation and other three-dimensional technologies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have