Abstract
Given that there is variable diameter in the shale gas plunger gas lift wellhead, which causes that the plunger cannot run up and down the gas well wellhead, affects the effect of plunger drainage gas production, the paper carries out research on liner tube without variable diameter of the shale gas plunger gas lift wellhead and installation methods, makes the diameter of the gas well wellhead consistent with that of the oil pipe, ensure that the plunger can be open up and down the wellhead of the Christmas tree, facilitate the periodic inspection and replacement operation of the plunger, and reduces the cost of plunger salvage operations. The successful application of the process plan in the shale gas well ** has achieved good drainage gas production effect, truly solved the variable diameter problem of shale gas plunger gas lift wellhead, and achieved the goal of once and for all.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.