Abstract

In view of high-load density, abundant in wind power and solar energy resources and well-developed areas in the southeastern coastal areas of China, A great number of power system planning problems have emerged. This paper first analyzes the limitations of electric power supply with 10kV voltage level and the advantages of using 20 kV voltage level in distribution network, and then it introduces the status and disadvantages of regenerative energy power to be incorporated into the large grid along the southeast coast of China at present. Finally it is discussed that the advantages of establishing the power supply system based on 20kV power distribution network and Microgrid according to the new resources distribution and the existing problems of medium voltage power distribution in southeast China.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.