Abstract

This paper proposes automatic power changeover switch system applied superconducting fault current limiter (SFCL) of the Korea electric railway using 25 kV-AC Scott transformer. The electric railway needs neutral section to separate two different electrical power phase to m phase and t phase. While the train passes through the neutral section, the electrical power supply phase is changed over to other phase. And that time, the train must turn off the circuit breaker to avoid transient as `inrush-current' and `arc'. These cause negative problems as speed decline of the train, a shorter life of the train circuit breaker. To improve the problems, the inrush current limitation method is proposed. In addition, we analysed the effect of proposed method using time-domain transient simulation software (PSCAD/ EMTDC).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.