Abstract

In the early stage, the monitoring system for No. 4 Adit in Guandi power station is mainly based on manual measurement. Considering the measuring period and safety problems, it needs to be transformed into automatic measurement. At present, there are two mature technologies, one is using fiber grating measurement scheme, and the other adopts wireless communication technology scheme. According to the actual situation of the field, the author finally adopts the wireless communication technology scheme. On the basis of the actual effect of automation system, NANRI GPRS DTU 4100 wireless communication technology is stable and reliable. This technology provides a guarantee for the safe operation of Guandi Hydropower Station.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call