Abstract

Value stream mapping (VSM) has been successfully applied to improve OEE and other performance parameters in a sewing line of VIP Industries Ltd. Improvement scopes have been identified from the current state map, and rough set theory has been adopted to identify focused areas and improvement strategy regarding where and how lean control should be approached. After that, two new layouts have been designed. Different performance parameters are calculated for both of the layouts and compared with the existing layout. New layout 2 exhibited the most promising outcome and is selected as the proposed layout. Production lead time, inventory and processing time are visualized in the future state VSM based on the proposed layout. Finally, OEE improved from 45 to 53.75%. This methodology is suitable for manufacturing environment having process layout and achieves the goals of reducing waste and improving productivity and performance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call