Abstract

The accuracy of TSP in tunnel geological prediction system is restricted to the conditions of construction site. In order to improve the accuracy of the prediction result, it is necessary to improve the collection accuracy. This article is for the angle to improvement of focal points, charging structure, optimizing the explosive charge, improvement of the detection holes for receiving conditions to improve the data precision. So that the focal point detonating degree guarantees at a higher level, the accuracy of the data is relatively well, and the interpretation results are more accurate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.