Abstract

The settlement of immersed tube tunnel is mainly caused by the compression of basal layer and recompression of the ground foundation layer. Defining the composite foundation as a combination of basal layer ofimmerse tube tunnel and ground foundation layer, a three-parameter model is proposed in this study to simulate the composite foundation in which the basal layer was represented using springs and the ground foundation layer by Kelvin’s model. Based on the solution of beam on elastic foundation, analytical solution for settlement of immersed tube tunnel using the proposed three-parameter model was derived by means of Laplace transformation according to the correspondence principle and the constitutional relationship of the three-parameter model. Initial and final settlement as well as variation of settlement in terms of time were calculated and compared with the actual measured data in combination with actual data measured during tunnelling of Shenjiamen immersed tube tunnel in Zhoushan City. Results showed that the proposed three-parameter model is capable of replacing the basal and ground foundation layers. The calculated value matched favourably with the actual measured value and the variation of settlement in terms of time for immerse tube tunnel can be represented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.