Abstract

The region of expedient using of SNPS with in‐core thermal thermionic reactor (ITR) is limited by electric power level of about 100 kWe under SNPS lifetime from 3 to 5 years. At the same time the reactor power may be forced from two to three times during the period of about half a year. The mathematical model of SNPS mass dependence on a degree of forcing is given. The results of calculation of payload masses and transfer times for transfer from low orbit to geostationary orbit for two thermal reactors having emission area 1.6 m2 and 2.5 m2 are given for different types of electrojets.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.