Abstract

This study uses data in the form of planning and implementation data for the construction of the Malinau District Arts Building. Data development is carried out by conducting Value Engineering analysis starting from the project information collection stage, followed by function analysis using the Law of Pareto. The method used to analyze the function is F.A.S.T diagram (Function Analysis System Technique) and Cost to Worth. Followed by the creativity stage to come up with new alternative designs that can minimize project costs. The selected design will be evaluated at the evaluation stage, then the development stage will be carried out to obtain cost savings on the type of work that has been analyzed by VE in detail. From the data analysis at the planning stage, the savings reached Rp. 642,220,790, while in the construction phase, savings of Rp. 491,286,382, in 80% of the jobs with the highest cost items.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.