Abstract
The selection of the appropriate procurement system (PS) for major highway projects in Greece is central to their success, as the relevant interdependent interfaces and required contracts between stakeholders are numerous and complex. The PSs investigated are traditional, traditional fast track, design and build, private-public partnership, construction management, management contracts and partnering. The relevant selection criteria that were considered refer to the project characteristics, the needs of the awarding authority and the market conditions. A questionnaire survey was carried out in order to record the performance of each PS against each selection criterion. The survey succeeded in collecting responses from 91 international highway procurement experts. The paper then evaluated the mean ratings of each PS against each alternative selection criterion. These ratings were considered as marginal utility values for use in the multi attribute utility theory method. The weights of each selection criterion are calculated using the revised Simos method, the analytical hierarchy process and goal programming. Two pilot projects in Greece were defined as case studies, for the proposed methodology to be tested. The results showed that the public-private partnership system is frequently chosen as the most appropriate PS.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Management and Decision Making
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.