Abstract

Although the computerised information system is conventionally used in production control, applying a manual-driven approach and improper logistics assignments typically lead to lower operating efficiency and a slower customer service response time. This study presents an experimental multi-agent system mobile enterprise information portal (MEIP), developed for real-time production controlling across the intra-/inter-organisational supply system. A new formalism called tri-base model of the multi-agent communication/negotiation mechanism is employed to simulate the just-in-time (JIT) control manufacturing system. Several novel technical devices such as mobile agent system, two-dimensional (2D) barcode system, etc., are used to establish the real-time data capture and communication system. The findings of the case study indicate that the experimental multi-agent system can respond to the status of the production line in real time. This can help the production controller making an effect decision.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call