Abstract

With the increasing scale of large-scale civil and industrial construction projects, the problem of controlling temperature cracks is of vital importance in order to ensure the integrity and durability of mass concrete foundation footings. This paper is based on an actual project of construction of a large volume concrete skip bin method, using Midas FEA NX to carry out finite element simulation of the construction process under the skip bin casting of the project, and study the temperature field derived from the simulation, and it is found that the temperature of this large volume concrete project is maximum at about 48h after the concrete casting, and the location is in the center of the concrete.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.