Abstract

Shipbuilding in the shipyard needs to be analyzed for risk management to minimize and take action to avoid risk. Risk management techniques in SNI IEC/ISO 31010:2016, namely the consequence and probability matrix. This study aims to identify hazards in new construction works and determine the level of consequences and the probability of a risk arising. This research's benefit is knowing the danger and risk level category. This study uses qualitative research and data collection techniques through in-depth interviews or direct observation in the field. The results showed 14 hazards from 3 jobs: plate cutting, welding, and lifting. The risk analysis scale shows a very high risk (priority I). The high risk (priority II), medium-high risk (priority III), low risk (priority IV), and shallow risk (priority V) in new construction works.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.