Abstract
For evaluation of technical condition of the buildings their constructions, you can use the methods of risk analysis. These methods may be used for pricing building and construction, depending on their condition, age and use During the subsequent design of the reconstruction or rehabilitation must always consider the scope and extent of the selected type of reconstruction in relation to the potential of harm (physical and financial). In the paper is applied to building assessment the method of universal matrix of risk analysis (UMRA).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.