Abstract
Piyungan Landfill is the biggest landfill in the Yogyakarta Province that still operates in overcapacity condition. A new alternative is highly required in solid waste management in the landfill, which can reduce the volume of the waste coming into it and decrease the need for a new landfill area. Refused-derived fuel (RDF) plant is one of the technological alternatives in solid waste management that has the potential to reduce the volume of solid waste and change the waste into fuel. The study analyzed the potential of the application of the RDF to reduce the volume of solid waste in the Piyungan landfill and its economic feasibility. The results of the analysis showed that during the operational period of the RDF plant, the volume of the solid waste coming into the landfill could be annually reduced by 43% on average. The results of the economic analysis show that the RDF plant in the Piyungan Landfill is feasible to apply with an NPV of IDR 281.46 billion, an IRR of 24%, and a payback period of 6 years.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.