Abstract

Abstract Configuration risk management refers to the use of probabilistic safety assessment technology to calculate risk indicators and perform risk management based on the actual operation configuration of nuclear power plant. Since its development in 1990, this method has been widely used in nuclear power plants. It can help power plant personnel optimize maintenance plan scheduling, control the nuclear risk level of units and improve the safety of power plants. During the shutdown and outage of the nuclear power plant, a lot of work has to be performed, resulting in the centralized shutdown of system equipment, and the nuclear safety during this period has attracted the attention of the power plant. Therefore, in order to ensure that the nuclear risk of the unit shutdown and outage can be controlled, Sanmen Nuclear Power, as the world’s first AP1000 unit, actively performs configuration risk management and control during the shutdown, It is the first time in China to optimize the outage plan scheduling through the combination of qualitative and quantitative configuration risk assessment method, so as to comprehensively investigate and eliminate the potential risk sources. This paper will mainly introduce the development background of configuration risk management, and take Sanmen Nuclear Power AP1000 unit as the object to introduce the application and achievements of qualitative and quantitative configuration risk assessment in outage scheduling optimization. In addition, it will also make a comparative analysis of qualitative and quantitative configuration risk assessment techniques.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call