Abstract
A pumping operation model has been developed in urban areas caused by the storm runoff. The Chung-Kong pumping station in New Taipei City is used as a case study, where storm and operating records are used to train and verify the model’s performance. Historical records contain information of rainfall amounts, inner water levels, and pump and gate operating records in torrential rain events. The results show that the case with lag time of 15 min gives the better forecasted pumping discharge than other cases. The proposed predicting pumping model successfully addresses the problems of forecasted pumping discharge.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.