Abstract

This paper deals with the problem of labor staffing in a service organization. The specific problem is the scheduling of auditors to audit tasks in a complex real life audit environment. We extend the methods of production scheduling to solve such a complex problem and apply these methods to a real life audit scheduling case. Each audit engagement is broken into a set of interrelated tasks and modeled as an activity network. The networks of the individual engagements are combined into a larger activity network. Even though the analysis of the large network answers certain managerial questions it does not answer the specific scheduling questions: when will each audit task start? who is the auditor? when it is completed? and how might the schedule change if the scheduling objective changes? To answer these questions the problem is formulated as an integer linear program in which the large network analysis is used to enhance its efficiency. The integer program accommodates different audit objectives and many real life situations. It is solved using existing computer codes. The model is then applied to a real life audit scheduling case to generate optimal audit schedules to all auditors and audit tasks. Naturally, the model allows for conducting parametric analysis and the generation of revised optimal schedules as the audit environment changes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.