Abstract

There are many issues surrounding the performance of critical assets on high-speed ballasted railway lines. At assets like switch & crossings and bridge transitions high track forces can be produced resulting in higher ballast settlements and hence track misalignments. The latter result in higher track forces and hence more settlement, leading to the need for increased track maintenance to ensure comfort and safety. Current technologies for solving issues like ballast movement under high-speed loading regimes are limited. However, a technique that has been well used across the UK and now increasingly overseas to stabilise and reinforce ballasted railway tracks is the application of in-situ polyurethane polymers, termed XiTRACK. This paper discusses how this technique can be used to solve these types of long-standing issues and presents actual polymer application profiles at two typical critical sites, namely a junction and a transition onto concrete slab-track.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.