Abstract

The construction process and load-bearing behaviors of Cast-in-place concrete thin-wall pipe piles are analyzed based on its application on Yantong Expressway Project. The low strain test, static load test and field excavation were also carried out, and the bearing capacity of the new pile can meet the requirements of design. With the increase of pile diameter, the bearing capacity is increased. The settlement of composite foundation is decreased, when the replacement ratio of pile is increased. The test results also show that the load carried by inner soils is neglectable. According to the tests and application, it can be concluded that the new type of pile is convenient to construction with high bearing capacity and reliable quality, which has great potential in practical engineering.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call