Abstract

Taking a project of Hangzhou as the example, a new management method named oppression construction method was proposed in soft soil of deep foundation pit engineering management. This method was based on the foundation pit excavation by layer and section. Through timely supporting of foundation pit and construction information management, the foundation pit supporting exposure time and exposed to the breadth and height was decreased. Thus the excavation process to the periphery environment influence was effectively reduced. It provided beneficial reference for the future of deep foundation pit engineering construction management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.